Winter Olympics Installation: 5,625 miles from HQ at -20C˚ temp
In early January ’18 a team of five fabricators from Cutting Edge flew out to South Korea to install a bespoke water installation as part of the 2018 Winter Olympics in Pyeongchang for the Hyundai Motor Company pavilion, designed by Asif Khan and iart. The fountain at 16.8 metres long and 7.8 metres wide, weighing…